York Home

Project Profile: Extension to a 3 bed room detached home in York

Our Works: Supply and install TLA200

The client came to us as a home-owner building an extension to a 3 bedroom detached property in York. Having originally planned the extension with a Beam and Block/PIR Insulation system, he was notified that his insulation supplier had let him down and wouldn’t be able to deliver the sufficient materials for 3 weeks. Given that he was living in the property with his young family at the time, this disruption to the works programme would have been a massive source of stress and anxiety. He asked whether we would be able to provide a quotation for a full system replacement with TLA200.

TLA 200 was selected at a depth of 180mm to hit the U-value requirement whilst simultaneously providing a sound structural base. The job was quoted, supplied, and installed within 4 days of the original quote being received, with the pour taking roughly 4 hours to complete. The client went from facing a potential month-long delay to being around two weeks in front of schedule, all whilst streamlining cost, deliveries, and workload. The finished substructure was walkable within 48 hours of the pour and provided all the thermal and structural requirements of the specification.